I finally finished the installation of the hydraulic system in the engine bay this evening. As you can see, in the photo to the left, the front brake lines are connected to the manifold and the rear brake line is routed from the engine bay to the differential.
Now that the hydraulics are fitted in the engine bay, we will begin the process of installing the engine and transmission.
Tomorrow evening we will fit the clutch assembly to the flywheel and bolt the transmission in place. After the starter is fitted to the bell housing, the engine and transmission will be ready hoist into place.
Tomorrow evening we will fit the clutch assembly to the flywheel and bolt the transmission in place. After the starter is fitted to the bell housing, the engine and transmission will be ready hoist into place.
Stay tuned,
Tom McCurry
No comments:
Post a Comment