Tuesday, October 11, 2011

PREPARING TO INSTALL THE NEW FLOOR PANS







It's been a while since my last post. I've been waiting on my friend Paxton to do the welding for me. Since I don't own a wire welder, it's cheaper to have someone do it for you...cheaper, not necessarily quicker.







I began by removing all the rust from the bonding surfaces and sealing the areas to be completely and permanently covered with POR. POR is a product that encapsulates rusty metal and virtually eleminates the need for further repairs. It is a bit pricey but worth every penney. But, be aware that you cannot use POR on surfaces to be joined by welding. Those surfaces will be coated with POR after the welding is completed because welded surfaces tend to rust quicker than usual.







My next post will deal with welding the floor pans in place.


Later

TD

No comments:

Post a Comment